Bridge Mills

 

£31K Net - Completed March 2019 - Scope - post and panel balustrade to balconies and upper terrace perimeter, privacy screens, 5 wire tension wire balustrade to lower terrace perimeter, also double staircase complete with tension wire balustrade to allow access to lower terrace.

We were contracted by CAPD to design, manufacture and install two balcony balustrades, upper terrace perimeter post and glass infill balustrade, double staircase complete with tension wire balustrade, and tension wire balustrade to lower terrace. This was a completed project so as with the majority of our projects a detailed survey was carried out to allow us to produce a solid model to easily convey the layout and complicated junctions to our client. Despite the complexities of this installation and the regular flooding of the lower terrace area the works were completed on time and to budget. The new staircase and balustrade provided for a stunning finish to the rear of this residential property.

 


Managed Engineering Project Solutions Ltd | Registered Office : Unit 10 Pearlbrook Industrial Estate, Chorley New Road, Horwich, Bolton, BL6 5PX
Registered in England 08277188 - VAT Reg No. 158 0904 04

© 2020 Managed Engineering Project Solutions Ltd (MEPS) - All Rights Reserved
No part of this website, including images, may be used without express written permission in accordance with our site Copyright Notice